This page gathers screeds laid over in-floor heating on several jobs photographed between 2019 and 2026. In each one the heating contractor laid the tubes first, and the dry pack screed went over them, set out with a laser so the floor above is flat and the heat spreads evenly.

In 2024, a large open building had its tubes laid in rows on mesh across the whole floor, with walk boards so nobody stepped on them. Mounds of mortar were placed between the runs, then the screed was struck to a laser on a tripod, one band at a time.

In 2025 the same work was done in a wood-frame house under construction, and in 2026 on an outdoor terrace, where green tubes on wire mesh were covered and struck with a straightedge. The earliest photo, from 2019, shows a room in a house with heating loops on a reflective underlay and the mortar spread between screed rails. The floor finish on top was laid by the flooring or tile trade once the screed allowed it.

The service: Dry pack floor levelling

  • Large open framed building with heating tubes laid in rows on mesh, walk boards, buckets and workers mixing at the far end
    2024: tubes down across a whole floor
  • Heating tubes on mesh in runs, with mounds of dry pack mortar placed between them
    2024: mortar going down between the runs
  • Heating tubes on mesh with a laser on a tripod and a screeded band of mortar in the foreground
    2024: screeding to the laser
  • Green heating tubes on wire mesh on an outdoor terrace, with two workers placing mortar and a straightedge
    2026: a heated terrace