Skip to content

The part nobody sees once the tile is down

Projects, 2018 to 2026

The part nobody sees once the tile is down, photographed before it disappears: from the crew's phones. Cropped, colour and exposure corrected, nothing added or painted out.

On the job, 2025 to 2026

Shower pans and pre-slopes

Scope and method

Home and commercial, 2025 and 2026

Shower floors and washrooms, packed to the drains

Shower pans and washroom floors in dry pack, packed tight around the drains and handed over for the waterproofing.

On the job, 2018 to 2026

Dry pack floor levelling

Scope and method

Home and commercial, 2019 to 2026

Screeds over in-floor heating

Heating tubes laid by the heating contractor, then the dry pack screed over them, set out with a laser.

Home, 2018 to 2023

Floors in houses and condos

A panelled living room, basements, a garage and a condo above the lake: screeds laid for the finish floor.

Commercial, 2019 to 2026

Commercial floors, set out with a laser

An atrium, open floors and change-room corridors: laser lines on the walls, gauge sticks and screed bays.

On the job, 2019 to 2024

Pool decks and terraces

Scope and method

Commercial, September 2024

Commercial indoor pool deck

The deck of a commercial indoor pool in dry pack: screed rails, a laser line on the wall, the strip along the pool finished first, then the bays.

Home, September 2023

Backyard pool floor

A dry pack bed on the floor of a backyard pool, screeded in bays with a straightedge and worked back toward the steps.

Home and commercial, 2019 to 2024

Pool floors, decks and a spa

Beds on pool floors and around indoor pools and a spa, laid ahead of the tile and stone.

Home, 2022 and 2023

Terraces and a pavilion

A raised terrace and a timber pavilion: beds screeded between rails, ready for the finish.

On the job, 2019 to 2023

Scratch coat

Scope and method

Home, 2019 and 2023

Scratch coat over wood subfloors

Metal lath fastened across the plywood subfloor, then mortar trowelled into it: a flat, solid base for the tile.

On the job, 2020 to 2025

Interior demolition

Scope and method

Home, September 2025

Basement back to the foundation walls

Drywall, framing and ceiling out, photographed over two days, the furniture wrapped in plastic, the floor scraped back to the concrete.

Commercial, September 2024

Restaurant floor, tile to slab

Ceramic tile set on the slab across a restaurant dining room, broken out and the old thinset scraped back to the concrete.

Home, 2020 to 2025

Tile and parquet floors lifted

Old tile, parquet and the mortar under them taken up in homes. In lived-in houses, walls and stairs go behind plastic first.

Home, 2020 and 2021

Rooms to the studs

Plaster, lath and drywall out to the framing, ready for new wiring, insulation and walls.

Free quote Photos