September 2024, commercial

Commercial indoor pool deck

One site, photographed on the job.

A commercial indoor pool deck, photographed on the job from September 17 to 19, 2024. The deck was laid in dry pack between screed rails, set to a laser line marked on the wall.

The first day started with a narrow strip between rails along the wall, with delineator posts keeping the area closed off. By the second day the long strip beside the pool was finished, divided by a rail line, and the crew was working across the deck, one of them lying flat to float the mortar. On the third day the bays along the pool were floated between the rails.

Working the edge along the pool first means the most visible line, where the coping and the tile meet the water, is set before the open bays, which are then struck off between the rails. The finished bed was handed over for the tile and the coping, which are set by the stone or tile setter.

The service: Pool decks and terraces

  • Narrow mortar bed being screeded between rails beside an indoor pool, with orange delineator posts and workers in hi-vis vests
    Sept 17: the first strip, between rails
  • Long finished mortar strip along a wall beside an indoor pool, divided by a rail line
    Sept 18: the strip along the pool, finished
  • Three workers on an indoor pool deck, one lying flat to float the mortar, with screed rails and loose mortar around them
    Sept 18: the crew on the deck
  • Two workers in hi-vis vests kneeling and floating mortar between rails along an indoor pool
    Sept 19: floating the bays along the pool