Skip to content

Dry pack floor levelling and screeds

Large tile and wood floors show every dip. We level floors across Toronto and the GTA with a dry pack screed, flat or sloped to a drain, set out with a laser. One condo room or a whole commercial floor, over in-floor heating too.

2018 to 2026: home and commercial, photographed on the job. See the 17 photos

Panelled living room with a fireplace and chandeliers, a large smooth dry pack floor screed and two workers kneeling at the far side
Set out
Laser
Laid
Flat or to falls
Over
Slab, subfloor, heating
Size
A room to a floor

Scope

What we do

  • Basements, houses and condos, room by room or whole floors
  • Screeds over hydronic in-floor heating tubes, laid by your heating contractor
  • Floors sloped to a floor drain: garages, mudrooms, washrooms and change rooms
  • Wire mesh in the screed where the floor calls for it
  • Commercial floors set out with a laser, ahead of the tile crew
  • Subfloors built up to meet a threshold or the next room

Handover

Ready for the next trade

These are done by other trades, so you know who to book.

WorkDone by
Heating tubes and manifoldsYour heating contractor
Floor drains and plumbingYour plumber
Tile, stone or wood flooringYour flooring trade
Slab repairs and structural workYour engineer and GC

Method

How we level a floor with dry pack

  1. 1

    Set out

    Laser lines on the walls and gauge sticks set to the finished height, flat or to a fall.

  2. 2

    Bond and mesh

    A bond coat on the base and wire mesh where the floor calls for it. Heating tubes stay as your heating contractor laid them.

  3. 3

    Screed in bays

    Dry pack laid between screed rails, ruled off to the line and floated.

  4. 4

    Hand over

    Checked with a straightedge and left ready for the tile, stone or wood.

Layers

What goes in, bottom to top

The layers marked Ours are our work. The others are shown so you can see where our work sits between the trades.

  1. 1Slab or subfloorCleaned and checkedBefore us
  2. 2Bond coatSlurry or bonding agentOurs
  3. 3Wire meshWhere the floor calls for itOurs
  4. 4Dry pack screedRuled flat or to falls, to a laser lineOurs
  5. 5Finish floorTile, stone or wood, by the next tradeAfter us

On the job

Screeds, photographed on the job

From the crew's phones. Cropped, colour and exposure corrected, nothing added or painted out.

All dry pack floor levelling projects

Home and commercial, 2019 to 2026

Screeds over in-floor heating

Heating tubes laid by the heating contractor, then the dry pack screed over them, set out with a laser.

Home, 2018 to 2023

Floors in houses and condos

A panelled living room, basements, a garage and a condo above the lake: screeds laid for the finish floor.

Commercial, 2019 to 2026

Commercial floors, set out with a laser

An atrium, open floors and change-room corridors: laser lines on the walls, gauge sticks and screed bays.

At home

Big tiles or a wood floor going down? They need a flat floor under them, or every dip shows.

Get a free quote

For the trade

GCs and tile contractors: floors handed over flat and on level, room by room, so your installers keep moving.

Request a bid

Questions

Questions about dry pack floor levelling

Dry pack screed or self-leveller?

Self-leveller suits thin, dead-flat pours. A dry pack screed takes more depth, can be sloped to a drain, and works over uneven old slabs and in-floor heating.

Can you screed over in-floor heating?

Yes. Your heating contractor lays the tubes; we screed over them to a laser line, ready for the finish floor.

How soon can the floor be finished?

Tile can often follow the next day. Wood and vinyl need the screed dry, so your flooring installer checks the moisture reading before they start.

Does large-format tile need a levelled floor?

Yes. Big tiles show every dip as uneven edges. Your tile setter checks the flatness the tile maker asks for, and we screed the floor to it.

Can you level a basement floor?

Yes, over a sound slab. Cracks from movement or water coming through the slab go to your GC or waterproofer first; then we screed it flat or to a floor drain.

Get a free quote for dry pack floor levelling.

Send photos and Ricardo prices it from them, or ask for a site visit. Toronto and the GTA.

Related services

Free quote Photos