Home, 2019 and 2023
Scratch coat over wood subfloors
Metal lath fastened across the plywood subfloor, then mortar trowelled into it: a flat, solid base for the tile.
Tile on a wood floor needs a solid, flat base, not bare plywood. In houses across Toronto and the GTA, we fasten metal lath across the subfloor and trowel a scratch coat of mortar into it, left flat and ready for the tile setter.
2019 to 2023: home, photographed on the job. See the 2 photos

Scope
Handover
These are done by other trades, so you know who to book.
| Work | Done by |
|---|---|
| Subfloor repairs and structure | Your carpenter or GC |
| Uncoupling or waterproofing membranes | Your tile setter or waterproofer |
| Tile and grout | Your tile setter |
Method
Sound plywood, fastened down, at the height the finished floor needs.
Metal lath laid across the subfloor and fastened.
Mortar trowelled into the lath and ruled flat.
Left to set, ready for the tile setter.
Layers
The layers marked Ours are our work. The others are shown so you can see where our work sits between the trades.
On the job
From the crew's phones. Cropped, colour and exposure corrected, nothing added or painted out.
Home, 2019 and 2023
Metal lath fastened across the plywood subfloor, then mortar trowelled into it: a flat, solid base for the tile.
Tiling a kitchen or a bathroom over a wood floor? The scratch coat gives the tile a solid, flat base instead of bare plywood.
Get a free quoteTile setters and GCs: subfloors lathed and coated before your crew arrives, room by room or a whole floor.
Request a bidQuestions
Metal lath fastened to the wood subfloor, with a coat of mortar trowelled into it. It gives tile a solid, flat base instead of bare plywood.
A scratch coat is a thin coat over lath on a wood subfloor. Dry pack is a thicker mortar bed, for building a floor up, levelling it or sloping it to a drain. Some floors get both.
Both give tile a base over plywood. Cement board and uncoupling membranes are sheets your tile setter lays; a scratch coat is mortar over lath, which can also flatten or build up the floor. Your tile setter or designer picks the system, and we lay the scratch coat when that is the plan.
Once the coat has set. Your tile setter checks it and follows the product sheet for their setting material before they start.
Send photos and Ricardo prices it from them, or ask for a site visit. Toronto and the GTA.
Related services