Service area
Dry pack contractor in Toronto
Condo towers downtown and along the waterfront, semis and detached houses in the older neighbourhoods, and basements being turned into living space across the city. Most of the dry pack work in Toronto is a shower floor in a bathroom renovation, a level bed for large tile, or a scratch coat over an old wood subfloor.
In Toronto
What the homes here usually need
Condo bathrooms
Shower floors packed to a linear or point drain, worked around elevator bookings and the protection rules of the building.
Shower pans and pre-slopesOlder houses on wood joists
Metal lath and a scratch coat over the subfloor, so tile and stone sit on a solid, flat base.
Scratch coatBasement renovations
Dry pack screeds that bring an uneven slab level for large-format tile or engineered wood.
Dry pack floor levellingTear-outs
Old tile, mortar beds and subfloor taken back to the structure before the new bed goes in.
Interior demolition
Check your address
Is your job in Toronto?
Questions
Common questions
Do you work in condo buildings?
Yes. Tell us the building rules (elevator booking, work hours, floor protection) in the quote form and the job is planned around them.
How is a Toronto job priced?
Send photos through the quote form and Ricardo prices the job from them, or asks for a site visit when the photos cannot show enough.