Home and commercial, 2025 and 2026
Shower floors and washrooms, packed to the drains
Shower pans and washroom floors in dry pack, packed tight around the drains and handed over for the waterproofing.
A shower floor is only as good as the bed under the tile. Across Toronto and the GTA, we pack the mortar by hand and slope it to the drain your plumber set, ready for the membrane and the tile.
2025 to 2026: home and commercial, photographed on the job. See the 4 photos

Scope
Handover
These are done by other trades, so you know who to book.
| Work | Done by |
|---|---|
| Waterproofing membrane and flood test | Your tile setter or waterproofer |
| Drain body, lines and venting | Your plumber |
| Tile and grout | Your tile setter |
Method
The slab or subfloor, the drain height your plumber set, and the finished floor height the tile needs.
Cement slurry or a bonding agent on the clean base, so the bed holds to it.
Sand and Portland cement mixed stiff and packed by hand to screed guides, with wire mesh where the floor calls for it.
A quarter inch per foot from the walls down to the drain, floated tight around the drain and the curb.
The fall checked with a level at each wall, and the bed left ready for your waterproofer.
Layers
The layers marked Ours are our work. The others are shown so you can see where our work sits between the trades.
On the job
From the crew's phones. Cropped, colour and exposure corrected, nothing added or painted out.
Home and commercial, 2025 and 2026
Shower pans and washroom floors in dry pack, packed tight around the drains and handed over for the waterproofing.
Redoing a bathroom? We lay the shower floor your tile setter needs: sloped where the water has to go, packed solid where the tile sits. The waterproofing and the tile go on top, by your trades.
Get a free quoteTile setters, waterproofers and GCs book us by the floor: single bathrooms, condo stacks and commercial washrooms, handed over ready for your membrane.
Request a bidQuestions
People use the words loosely. A pre-slope is the sloped mortar bed under a traditional liner. A bonded shower pan is one sloped bed that a sheet or liquid membrane goes straight onto. We build the one your waterproofer or tile setter is working to.
The usual fall is a quarter inch per foot, about 2 %, from the walls down to the drain. Some waterproofing systems set their own minimum, so we pack to the one your waterproofer is working to.
No. We build the sloped bed and hand it over. The membrane and the flood test are done by your tile setter or waterproofer, to the system they use.
A dry pack bed can usually be walked on the next day. Each membrane maker sets its own wait over a fresh mortar bed, so your waterproofer follows the product sheet for theirs.
Yes, when the floor allows it. A curbless shower needs a recess in the slab or subfloor, or the bathroom floor built up to meet it. A linear drain lets the floor fall in one plane. Your plumber sets the drain; we pack the floor to it.
Send photos and Ricardo prices it from them, or ask for a site visit. Toronto and the GTA.
Related services