Commercial, September 2024
Restaurant floor, tile to slab
Ceramic tile set on the slab across a restaurant dining room, broken out and the old thinset scraped back to the concrete.
Every new shower floor starts with the old one coming out. Across Toronto and the GTA, we take rooms back to the slab or the studs, behind plastic, with the debris bagged and the floor left clear for the new bed.
2020 to 2025: home and commercial, photographed on the job. See the 15 photos

Scope
Handover
These are done by other trades, so you know who to book.
| Work | Done by |
|---|---|
| Asbestos testing and removal | A lab, then a licensed abatement contractor |
| Capping plumbing and power | Your plumber and electrician |
| Structural walls and beams | Your engineer and GC |
Layers
On the job, September 2025
Home, September 2025
Drywall, framing and ceiling out, photographed over two days, the furniture wrapped in plastic, the floor scraped back to the concrete.
1 / 5
On the job
From the crew's phones. Cropped, colour and exposure corrected, nothing added or painted out.
Commercial, September 2024
Ceramic tile set on the slab across a restaurant dining room, broken out and the old thinset scraped back to the concrete.
Home, 2020 to 2025
Old tile, parquet and the mortar under them taken up in homes. In lived-in houses, walls and stairs go behind plastic first.
Home, 2020 and 2021
Plaster, lath and drywall out to the framing, ready for new wiring, insulation and walls.
Redoing a bathroom or a basement? Book the tear-out and the new bed together, and there is no gap to arrange between two trades.
Get a free quoteGCs and tile contractors: strip-outs ahead of your crews, swept and ready for the next trade. Commercial floors taken to the slab.
Request a bidQuestions
Yes. On small jobs the debris is bagged and carried out as we go. For a basement or a commercial floor we arrange a bin and fill it as we go.
In a lived-in home, plastic walls go up around the work area and the stairs and railings get covered before we start. You can see it in the hallway photos.
Homes built before 1990 can have asbestos in vinyl tile, mastic, plaster, joint compound and pipe insulation. In Ontario it must be checked before demolition starts. We ask for a lab test of anything suspect, and on commercial jobs the designated substance survey. Anything that tests positive is removed by an asbestos abatement contractor before we start.
Your plumber and electrician cap the lines before we start. We work around the capped lines and leave valves and boxes exposed for them to find.
Yes. Once the slab is clean, the dry pack or screed can go down straight after.
Send photos and Ricardo prices it from them, or ask for a site visit. Toronto and the GTA.